| |
|
|
Wastewater Management Plan Archive
Plan Development Archives |
| 9-15-03 |
Summary of Recommended Text Changes (PDF) for Draft Long-term Wastewater Management Plan
|
|
June 2003



|
- Task 15 - Draft Long-term Wastewater Management Plan
- Task 15 - Preliminary Draft Long-term Wastewater Management Plan
- Task 14 - Recommended Solution and Implementation Plan for Water Supply and Wastewater for 2030
- Task 13 - Development of Education and Public Awareness Measures
- Task 12 - Sewer Collection System Inspection and Maintenance Program
- Task 11 - Septic System Inspection and Maintenance Program
- Task 9/10 - Develop and Evaluate a Recommended Set of Alternatives and Management Strategies
- Alternatives Analysis and Preliminary Management Strategies
- Part 1 (PDF)
- Part 2 (PDF)
- Part 3 (PDF)
- Appendix A (PDF) - Water Discharge Quality
- Appendix B (PDF) - Cost Curves
- Appendix C (PDF) - Solution Phasing and Capital Cost Estimates
- Appendix D (PDF) - Conveyance Projects
- Appendix E (PDF) - Environmental Justice Needs and Strategies
- Figure 1 (PDF) - Concentrations of Non-White Population by Census Block Groups
- Figure 2 (PDF) - Percentage of Households in Poverty by Census 2000 Block Groups
- Appendix F (PDF) - Review of BAC Weighting of Policy-goal Criteria
- Appendix G (PDF) - Description of Recommended Solution for Water Supply by County
- Appendix H (PDF) - Description of Recommended Solution for Wastewater by County
- Non-Capital Needs and Strategies (PDF/2.24 MB)
- Evaluation Criteria
- Task 8 - Identify Constraints to Implementation
- Task 7 - Identification of Long-term Options
- Short-listed Water Supply and Wastewater Solutions for 2030
- DRAFT Range of Water Supply and Wastewater Solutions
- Task 6 (PDF) - Identification of Technologies
- Task 5 Identification of Wastewater Treatment Requirements
- Task 4 Review and Inventory of Existing Wastewater Facilities and Plans
- Task 3 (PDF) - Development of Policy Goals to Guide the Planning Process
|
|
|